Chapter 3 Installation
13
A: Lifting CPS SC500KTL with a crane
:
Put 4 sling ropes through the four eye bolts on the top of
inverter
(
each no shorter than 1 meter
)
.Then lift the machine
slowly to the appropriate location for installation with the
crane (shown in Figure 3-5).
Center of gravity:
1200-1300mm to the left edge
About 500mm to the front door
Figure 3-5 Diagram of lifting
CPS SC500KTL with a crane
B: Lifting CPS SC250KTL-H with a crane
:
Put 4 sling ropes through the four eye bolts on the top of
inverter
(
each no shorter than 1 meter
)
.Then lift the machine
slowly to the appropriate location for installation with the
crane (shown in Figure 3-6).