Chapter 4 Operation
29
start up/shut down. When the output voltage and power of
PV panel meet the set point, AC power grid is normal, and
the ambient temperature is within allowable operating range,
the inverter will start up automatically.
Manual start-up
: If the inverter is shut down manually, it
should be started up by manual as well.
Move the cursor from the main operation interface to “4
Setting”. Press ENTER and go to submenu “1 ON/OFF”.
Press “ON” to start up the inverter. The inverter will enter the
state of normal operation if the start-up conditions are met; if
not, the inverter will stand by.
Warning:
If the DC circuit breaker is tripped because of
malfunction, it is prohibited to turn on the DC circuit
breaker directly. System reset program must be
executed and then turn on the DC circuit breaker
according to the indication on the LCD.
4.1.2 Shut-down
Manual shut-down
: Normally, manual shutdown is not
necessary. It can be shut down manually if repair or
maintenance is required.
(1) Move the cursor from the main operation interface to
“4 Setting”. Press ENTER and go to submenu “1 ON/OFF”.
Press ENTER when the cursor stays on “OFF”. Then the
inverter is shut down.