30
Chapter 4 Operation
(2) Press the “emergency stop button” on the panel to
shut down the inverter in case of emergencies.
Automatic shut-down
: When the inverter is under
normal operation and if the inside 3 phase output AC is not
cut off or the outside 220V AC is not interrupted, the inverter
will enter the state of automatic start up/shut down. When
the output voltage and power of PV panel does NOT meet
the set point or the power grid breaks down, the inverter will
shut down automatically.
Manual Shut-down for maintenance
: If service
personnel need to maintain or repair the inverter, the manual
shut-down operation steps should be conducted at first and
then execute the “De-energy” program.
The “De-energy” steps are as follows:
(1) Turn off the two DC circuit breakers by manual and
ensure that the AC circuit breaker is turned on.
(2) Conduct the manual shut-down operation steps and
execute the “De-energy” program.
(3) Move the cursor from the main operation interface
to“4 Setting”, press ENTER and go to submenu “6
OtherCmd”. Then move the cursor to “1 De-energy” and
press ENTER, as shown in Figure 4-7.