Installation & Setup
Roadster & Mirage S+/HD User Manual
2-9
020-100002-04 Rev. 1 (12-2008)
Release and remove three safety pins
The safety pins must be removed from the
stacking mounts so that the stacking legs can fit
into the mounts (Figure 2.13).
•
If upright – remove the pins from the mounts
on the bottom projector.
•
If inverted – remove the pins from the
mounts on the top projector.
Place top projector on bottom projector
WARNING
Minimum of two people required.
With one person on each side, lift the top projector on to bottom projector, aligning
all three stacking points between projectors. The legs should fit inside the stacking
mounts.
Align the holes in the three stacking mounts and three stacking legs.
On each stacking mount, turn the adjusting wheel slightly until the hole in the top
portion of the mount lines up with the hole in the stacking leg (Figure 2.14).
NOTE:
You can increase leverage by using a screwdriver in the holes.
Figure 2.14. Align Holes in Mounts and Legs, and LOCK with Pin
Figure 2.13. Remove Safety
Pins
STEP
5
STEP
6
STEP
7