Assembling the gas train
To assemble the main gas train, proceed as follows:
Fig. 8 - Example for gas train
1-a) in case of threaded joints: use proper seals according to the gas used;
1-b) in case of flanged joints: place a gasket (no. 1A..1E - Fig. 8) between the items
2)
fasten all the items by the screws, according to the shemes shown, observing the mounting direction for each item (see figure
above).
NOTE:
the bellows unit, the manual vale and the gaskets are not part of the standard supply.
The procedures of installation fo the gas valves are showed in the next paragraphs, according to the gas train used:
z
threaded gas trains with Multibloc Dungs MBC..SE 1200 or Siemens VGD20..
z
flanged gas trains with Multibloc Dungs MBC..SE 1900-3100-5000 or Siemens VGD40..
ATTENTION:
once the gas train is mounted according to the diagram on Fig. 8, the gas proving test mus be performed,
according to the procedure set by the laws in force.
ATTENTION:
it is recommended to mount filter and gas valves to avoid that extraneous material drops inside the valves,
during maintenance and cleaning operation of the filters (both the filters outside the valves group and the ones built-in the
gas valves).
1A
5
1B
4
1C
2
1D
1E
3
Keys
1A..1E
Gasket
2
Gas filter
3
Gas valves group
4
Bellows unit
5
Manual valve
”direction” arrows for installation
gas supply network