GB
GB
GB
GB
GB
19
19
19
19
19
Machine LogMachine LogMachine LogMachine LogMachine Log
(to be filled in when star
ting the unit)
Dr
inking w
a
ter hardness
inflo
w
____________°d
Date of initial star
t-up ____________________
Netwo
rk
pressure
____________________bar
W
a
ter meter status ____________________m
3
P
e
rsonnel tr
ained
___________________________________________________________________________________________
Regener
ativ
e
refilled
Maintenance perf
o
rmed
Date/name
Regener
ativ
e
refilled
Maintenance perf
o
rmed
Date/name
Comments
_________________________________________________________________________________________________________
__________________________________________________________________________________________________________________