- 7
-
NOTE: When leaving reheatable material in tank, allow the agitator to run until the oil
and material temperatures are the same.
PROCEDURE:
PAGE
18)
Turn the temperature control box off and shut off engine.
14,16
19)
Coil sealing hose and place in cabinet along with wand (Non-heated
hose models only).
20)
Lock hose boom in tow position.
21)
Always secure sealing wand, sealing hose and hose boom
before towing the Melter.
Operating Sequence
On electric hose option only.
Summary of Contents for MAGMA 110
Page 48: ... 48 Wiring Diagrams Refer to Individual Wiring Diagrams for Details ...
Page 49: ... 49 Wiring Diagrams Trailer Wiring Diagram ...
Page 50: ... 50 Engine and Burner Wiring Harness Wiring Diagrams ...
Page 51: ... 51 Wiring Diagrams Relay Panel ...
Page 52: ... 52 Wiring Diagrams Temperature Control Wiring Diagram ...
Page 53: ... 53 Wiring Diagrams Primary Control ...
Page 54: ... 54 Wiring Diagrams LOFA Engine Shutdown Heated Hose Generator ...
Page 59: ... 59 Plumbing System Parts List Dual Wand Single Wand ...
Page 75: ... 75 11 12 Miscellaneous Parts ...
Page 77: ... 77 ...
Page 78: ...2601 Niagara Lane Plymouth MN 55447 763 557 1982 800 328 3874 Fax 763 557 1971 ...