6.3
Assembling
1.
Carry out the same steps in reverse order of removal.
2.
DO NOT FORGET THE GR
3.
To proceed to testing
4.
ATTENTION WITH THE
a.
If the power supply was cut up
RCCB. If it is not possible to supply it just
RCCB
.
b.
If long time passed between the disconnection operations
do the sensitivity test again as indicated in the previous section.
Proceed to press the test button.
c.
If keeps not running, treat the incident as a failure, with the protocol
established by those.
5. Replace the lid and set it correctly.
CIRCONTROL, S.A. – Innovació, 3 – 08232 – Viladecavalls (Barcelona)
Tel.: +34 937 362 940 – Fax: +34 937 362 941
rcontrol.com – E-mail:
circontrol@circontrol.com
Carry out the same steps in reverse order of removal.
DO NOT FORGET THE GROUND CABLE RECONNECTION.
To proceed to testing RCCB should be reconnected again
ATTENTION WITH THE RCCB CONNECTION PROCESS
!
If the power supply was cut upstream, supply the devices to test the
. If it is not possible to supply it just raise the handle to rearm the
If long time passed between the disconnection operations
sensitivity test again as indicated in the previous section.
Proceed to press the test button.
If keeps not running, treat the incident as a failure, with the protocol
established by those.
and set it correctly.
Viladecavalls (Barcelona)
18
, supply the devices to test the
raise the handle to rearm the
If long time passed between the disconnection operations RCCB, should
sensitivity test again as indicated in the previous section.
If keeps not running, treat the incident as a failure, with the protocol