65
C
Starting up configuration
A)
Setup Page
Once you have chosen your OCPP option at the previous step, a link appears allowing
access to the OCPP configuration.
Please, click on the link button as shown in the picture:
New tabs are opened to show OCPP Settings. First time is running the integration
selected on the charge point, it starts as configuration mode and all fields are empty.
Settings are always stored even when the Charge Point is powered off or even the
integration is disabled/stopped.
Summary of Contents for CCS
Page 1: ...Instruction Manual Raption 50 Series ...
Page 2: ......
Page 4: ......
Page 10: ...06 Raption 50 Series Instruction Manual C Dimensions Units specified in millimeters ...
Page 39: ...35 3 CONNECTOR DISABLE 4 CONNECTOR IN USE ...
Page 40: ...36 Raption 50 Series Instruction Manual 5 CONNECTOR RESERVED 6 CONNECTOR BLOCKED PER RESERVED ...
Page 41: ...37 7 CONNECTOR BLOCKED PER CHARGING ...
Page 43: ...39 ...