10
Raption 150 Series Installation Manual
Whenever
possible, the Charge point must be unloaded in their place
of installation and operation. In case of unloaded to a temporary
location for storage, it is convenient to not remove the packaging
and store them meeting the following minimum requirements:
•
Safety: Charge Point must be protected against negative elements such as
heat radiation, direct solar radiation, mechanical damage, organic dissolvent
impacts, etc.
•
Temperature: for temperatures below -20 ºC and over +60º C special attention
must be paid to the storage and handling.
•
Environment: Charge Point must be stored in a dry and dust-free location. The
distance from a heat source must be 1 m away. Outdoor storage of the unit has
to be avoided.
E
Storage
What’s included:
Charge Point
Installation
Manual
CirCarLife RFID
Mifare Card
Acces door Key
Power Unit
Foundation Kit
Dispenser
Foundation Kit
Eyebolt
Summary of Contents for Raption 150 Series
Page 1: ...Installation Manual Raption 150 Series ...
Page 2: ......
Page 4: ......
Page 7: ...03 ...
Page 20: ...16 Raption 150 Series Installation Manual Power Unit front door Power input supply ...
Page 21: ...17 Power Unit rear door Output wiring to Dispenser ...
Page 27: ...23 1 2 3 4 ...
Page 34: ...30 Raption 150 Series Installation Manual E Dispenser template dimensions 435 300 70 ...
Page 35: ...31 400 165 280 310 ...
Page 37: ...33 0 1920 ...
Page 51: ...47 CCS CCS CHA CHA 3 ...
Page 53: ...49 PE DC 2 L N PE ETHERNET CABLE 2 1 3 DC 1 2 2 Wiring connection for the Dispenser Scheme ...
Page 55: ...51 L1 N PE ETHERNET 1 2 ...
Page 56: ...52 Raption 150 Series Installation Manual CCS CCS 3 ...
Page 57: ...53 CHA PE CHA 3 ...
Page 59: ...55 ...
Page 65: ...61 ...