5�2�- PREPARATION OF FOOTINGS
MAX
10º
300mm
MAX
D
D
CASKET
REINFORCED TWIN-LAYER PIPE
MAXIMUM CAPACITY PER FOOT OF 4 TUBES, 40mm DIAMETER
PROJECTION OF A LENGTH OF 6 M APPROXIMATELY FROM CASKET SPLICE FOR THE LOWERING OF STRINGS,
DC WIRING.
IF IT IS ONLY FOR AC WIRING OF THE CHARGER, PROJECTION OF 4 M APPROXIMATELY OF CASKET SPLICE.
LEAVE CABLES IN
PLACE
CA
SKET
FOO
TING
FOOTING ALIGNMENT
SPLICE BOX
Figure 9: Preparation of footings�
17
Installation Guide
PVS2, PVS2-R