- Date of completion of the works.
- Visually reviewed points.
- Damages in the visually reviewed points.
- Points reviewed using gauge key.
- Points that have been retightened due to tension slipping.
- If protective paintwork has been added.
- Remarks.
Maintenance work must be carried out with sufficient trained personnel who are qualified to complete
these tasks.
The maintenance guidelines must be adjusted and, if necessary, these must be changed periodically
according to the conditions of service and the product’s alteration over time.
11�3�2�- REVISION AND MAINTENANCE TASKS
11�3�2�1�- Periodicity: every six months
Visual inspection of the entire canopy, looking for possible damage to the entire structure such as
bumps, fissures, deformations, breaks, or possible rust issues. The fastening hardware at the angles
between the flag and the belts are points in which special attention must be paid.
Any damage will be repaired immediately to avoid possible accidents or lack of service.
Table of minimum visual revisions:
Table 3: Visual revision chart�
Visual revision
Appearance
Deformation
Base anchor screws
Top layer
Welding base Joint
Screws in the joint of the base and the foot
Point P1
Screws in the joint of the foot and the wing
Screws in the joint of the flag and the angle
Angle
Screw in the joint of the angle and the belts
End contact point between belts and angle
Belts central point
11�3�2�2�- Periodicity: annual
Check all the fastening screws of the sail with a torque wrench (base / foot / wing).
Review with normal key of all the screws of the cover (in this case the torque wrench is not necessary).
Should it be observed that in each revision there are several screws that are not with the correct
tightening torque, it will be necessary to carry out these revisions more frequently and to try to
determine the reason why these screws come loose (excessive vibrations, excessive clearances or
other causes).
11�3�2�3�- Periodicity: every 3 years
Carrying out a repaint every 3 years with Valentine’s Oxigel Pavonado paint or similar. Should rust be
46
PVS2, PVS2-R
Installation Guide