14
RECmax-CVM
Instruction Manual
3�4�- CONNECTION DIAGRAMS
3�4�1�- MEASUREMENT OF SINGLE-PHASE NETWORK: RECmax-CVM 2-POLE
L1
N
IL1
(19)
IL2
(20)
IL3
(21)
C
(22)
I∆
(1)
I∆
(2)
Figure 6: Measurement of single-phase network: RECmax-CVM 2-pole�
All active conductors that feed the load to be protected, including the neutral, must
pass through the internal diameter of the earth leakage transformer� Do not pass the
protective conductor or the earth wire�
The current measurement transformer must be installed at the top of the circuit
breaker�