25
Instruction Manual
RECmax Lpd
6.- CONFIGURATION
The correct operation of the
RECmax Lpd
depends on its correct adjustment. Since
it is a protection device, erroneous adjustment can compromise the protection of
property and people. That is why it is very important that it is adjusted by a trained
technician to decide on the most appropriate type of protection in each installa-
tion.
CIRCUTOR
accepts no responsibility for incorrect working of the device due to
erroneous adjustment
6�1�- EARTH LEAKAGE PROTECTION
To configure the earth leakage protection, press the
PROG
key for more than 3 seconds, while the
Delay and Sensitivity
.
td s
A
I n
REC
td s
PROG
PROG > 3s
Figure 14: Configuration: Earth leakage protection�
6�1�1�- ACTIVATION DELAY
Configure the activation delay value on this screen,
Δt(td)
.
td s
PROG
Press the
RESET
key to modify the value. The possible values are:
INS
, reverse curve according to the leakage current intensity measured,
IΔ
, with instantaneous
shows the activation times.
SEL
, reverse curve according to the leakage current intensity measured,
IΔ
, with selective pro-
gramming.
0�1s, 0�2s, 0�3s, 0�4s, 0�5s, 0�6s, 0�8s, 1s
, fixed values.
Table 19: Activation times of the reverse curve�
Maximum operating time for I
Δ
Type
I
Δ
n
I
Δ
: 1 x I
Δ
n
I
Δ
: 2 x I
Δ
n
I
Δ
: 5 x I
Δ
n
500 A
INS
tantaneous
All the values
0.3 s
0.15 s
0.04 s
0.04 s
SEL
ective
> 0.03 A
0.5 s
0.2 s
0.15 s
0.15 s
Note:
Standard values of the IEC 61008-1.