95-01-01
Page 54
Serials 1423 & subs w/o Perspective after SB2X-95-18,
2228 & subs
EFFECTIVITY:
C I R R U S
C O M P O N E N T M A I N T E N A N C E M A N U A L - C A P S
M O D E L S R 2 0
4 May 2015
Figure 95-01-0111
Rocket Installation - Serials 1423 & subs w/o Perspective after SB2X-95-18, 2228 & subs (10 of 10)
1
Do not overtighten aluminum tension screws. Torque to 1 - 5 in-lb (12 - 56 Ncm).
2
Verify anchor blocks are perpendicular to pick-up collar assembly. If pick-up collar
assembly is not fully seated against the anchor blocks, use pliers to gently adjust
anchor blocks as required.
3
Apply medium threadlocker to screws.
5
Position frangible link such that perforated break line is on end closest to
rocket. Failure to comply will absolutely FAIL rocket deployment!
6
NOTE
1
Position rocket lanyard around top outer diameter of pick-up collar support, NOT
over top of the rocket. Failure to comply will absolutely FAIL rocket deployment!
6
11
2
24
25
Apply light threadlocker to screws.
4
VIEW
A
5
2
9
10
ANCHOR
BLOCK
(REF)
6
16
15
11
3
1
2
22
11 2
1
2
11
19
2
21
BH 222
(REF)
26
11
4
13
IGNITER
SWITCH
(REF)
FIRING PIN
ACTUATOR
(REF)
2
2
1
2
21
2
TO WIRING
HARNESS
5
A
A
Serials 1423 & subs w/o Perspective after SB2X-95-18, 2228 & subs.
LEGEND
1. Bolt
2. Washer
6. Rocket Lanyard
9. Pick-up Collar
10. Pick-up Collar Support
11. Screw
13. Activation Cable
15. Launch Tube
16. Rocket Motor
19. Cone Adapter
21. Nut
22. Bracket
24. Frangible Link
25. Standoff
26. Fitting
SR20_CM95_3556C