95-01-01
Page 64
All
EFFECTIVITY:
C I R R U S
C O M P O N E N T M A I N T E N A N C E M A N U A L - C A P S
M O D E L S R 2 0
4 May 2015
(b)
Ensure safety pin is installed.
(c)
Position activation cable handle bracket over mounting holes and secure to fuselage ceil-
ing installing new screws, washers, and nuts. Torque to 15.0 - 20.0 in-lb (1.7 - 2.2 Nm).
(d)
Fill, prime and paint screw holes.
(e)
Install grommet to cable pass-through hole in parachute compartment.
Note:
If Stormscope or Skywatch installed, route activation cable above antenna
cables.
(f)
Route activation cable aft, through improved BH 222 cable pass-through and up through
LH cable pass-through hole in parachute compartment.
(g)
Loosely attach activation cable to forward and middle cable tie anchors with cable ties.
(h)
Serials 1005 thru 1267 before SB2X-95-20, 1268 thru 1422 before SB2X-95-17
: Ensure
activation cable is routed through shield slot, install cable grommet, and secure with sili-
con sealant.
(i)
Between middle and aft cable ties, solvent clean with isopropyl alcohol and apply two-
sided tape primer 3.0 inches (7.6 cm) either side of activation cable routing leaving the last
three inch section, just forward of aft cable tie anchor, uncovered.
(j)
Loosely attach activation cable to aft cable tie anchor with a cable tie.
CAUTION:
Verify activation cable routing is correct, is free and clear of other compo-
nents, and activation cable does not contact edges of improved BH 222
cable pass-through hole. Install cable routing placards along new cable
route.
(k)
Cut aluminium tape into three sections and install aluminium tape over activation cable
leaving the last three inch section of activation cable, just forward of aft cable tie anchor,
uncovered.
(l)
Install spiral wrap to forward portion of activation cable so that cable will not chafe on
speaker or antenna installations.
(m)
Install spiral wrap to aft portion of activation cable behind BH 222 so that cable will not
chafe on static lines or BH 222 cable pass-through hole.
(n)
Perform Operational Test - Activation Handle and Cable Assembly.
(o)
Install rocket assembly.
(p)
Position cabin headliner to ceiling and install activation handle recess trim.
(q)
Install LH B-pillar trim. (Refer to AMM 25-10)
(r)
Install tape securing headliner to door frame.
(s)
Install LH and RH door seal to top edge of door frames. (Refer to AMM 53-40)
(t)
Install LH and RH cabin flood light assemblies. (Refer to AMM 33-10)
(u)
Install LH rear headliner. (Refer to AMM 25-10)
(v)
Remove catch cloth from below rocket and parachute assembly.
(w)
Install access panels CB6 and CB7 from BH 222. (Refer to AMM 06-00)
(x)
Serials 1005 thru 1267 after SB2X-95-20:
Connect battery 1 at both positive and negative
terminals. (Refer to AMM 24-30)
(y)
Install BH 222 trim panel and carpet. (Refer to AMM 25-10)
Airtech Teflon Tape,
1-inch
Teflease
MG2A
Airtech International
Huntington Beach, CA 92647
714-899-8100
Sealing.
Description
P/N or Spec.
Supplier
Purpose