◦
To install or remove modules
◦
To remove the cover, if you are upgrading memory or other components
•
Screws that fit your rack
•
Wire crimper
•
Wire for connecting the chassis to an earth ground:
◦
AWG 14 (2 mm 2 ) or larger wire for NEC-compliant chassis grounding
•
For NEC-compliant grounding, an appropriate user-supplied ring terminal, with an inner diameter of
1/4 in. (5 to 7 mm)
Installation Checklist
The sample installation checklist lists items and procedures for installing a new router. Make a copy of this
checklist and mark the entries when completed. Include a copy of the checklist for each router in your site
log (described in the next section, Creating a Site Log).
Table 6: Checklist
Date
Verified By
Task
Installation checklist copied
Background information placed in
Site Log
Site power voltages verified
Installation site power check
completed
Required tools available
Additional equipment available
Router received
Router quick start guide received
Regulatory Compliance and Safety
Information for the Cisco 1100
Series ISRs document received
Product registration card received
Cisco.com contact information
label received
Hardware Installation Guide for the Cisco 1100 Series Integrated Services Router
21
Preparing for Router Installation
Installation Checklist