40
Cisco 6100 Thermal Upgrade Kit Installation Procedures
78-10158-01
Installing the Cisco 6100 Thermal Upgrade Kit
Step 10
Tie wrap the transmit and receive cables coming from the system I/O card where the cables meet after
coming from the ferrites and every 1 foot thereafter for a total of 15 feet, as shown in Figure 26.
Figure 26
Ferrites Close to DS3 BNC Connectors on System I/O Card
Note
If you have one subtending host chassis with two subtended node chassis, the
second subtended node chassis connects to the TX2 and RX2 DS3 BNC
connectors on the DS3 subtending I/O card.
J1
TX
RX
P1
P2
J7
D25
C25
B25
A25
E25
D1
C1
B1
A1
E1
System
I/O card
DS3 BNC
connector
DS3 BNC
connector
18470
Ferrite
Tie
wrap
Tie wrap
every
1 ft
for 15 ft
Tie
wrap
Ferrite
J4
J3