3-19
Cisco AS5350 Universal Gateway Chassis Installation Guide
78-10754-03 0A
Chapter 3
Installing the Cisco AS5350
Where to Go Next
Warning
After wiring the DC power supply, remove the tape from the circuit breaker switch handle and
reinstate power by moving the handle of the circuit breaker to the ON position. To see translations of
the warnings that appear in this publication, refer to the
Regulatory Compliance and Safety
Information
document that accompanied this device.
Step 3
Power on the universal gateway.
The internal power supply fan should power on.
Where to Go Next
When you power ON the Cisco AS5350 for the first time, messages will begin to appear on your console
screen. Refer to the Cisco AS5350 and Cisco AS5400 Universal Gateway Software Configuration Guide
for configuration instructions. This document is available on the World Wide Web and the
documentation CD-ROM that comes with your Cisco AS5350. (See the “Obtaining Documentation”
section on page xiii.)
The remaining chapters of this guide include reference material for replacing spare parts,
troubleshooting, and creating your own cables:
•
Chapter 4, “Troubleshooting”
•
Appendix A, “Replacing Memory Components”
•
Appendix B, “Replacing the Power Supply”
•
Appendix C, “Cabling Specifications”