The upper fan tray pulls the heated air up through the chassis. The heated air then exits through the side and
rear exhaust vents located at the top of the chassis.
Figure 69: System Airflow and Ventilation
When planning chassis installation, ensure that equipment rack or cabinet hardware does not hinder air
flow at any of the intake or exhaust vents. Additionally, ensure that the rack/cabinet hardware, as well as
the ambient environment, allow the system to function within the operating limits specified in this chapter.
Caution
ASR 5000 Installation Guide
253
Environmental Specifications
Chassis Air Flow
Summary of Contents for ASR 5000
Page 16: ...ASR 5000 Installation Guide xvi About this Guide Contacting Customer Support ...
Page 64: ...ASR 5000 Installation Guide 48 Installation Procedure Overview Laser Notice ...
Page 100: ...ASR 5000 Installation Guide 84 Line Card Installation Installing the XGLC ...
Page 122: ...ASR 5000 Installation Guide 106 Cabling the Fast Ethernet 10 100 Line Card FLC2 Interfaces ...
Page 206: ...ASR 5000 Installation Guide 190 Removing and Installing SMC PC Cards Removing PC Cards ...
Page 212: ...ASR 5000 Installation Guide 196 Replacing the Chassis Air Filter Installing the Air Filter ...
Page 220: ...ASR 5000 Installation Guide 204 Replacing a Power Filter Unit What to do with the Failed PFU ...
Page 266: ...ASR 5000 Installation Guide 250 Safety Electrical and EMC Certifications Korean EMC ...
Page 270: ...ASR 5000 Installation Guide 254 Environmental Specifications Chassis Air Flow ...