Table 5: Environmental Compliance Standards
Standard
Type
Telcordia GR-63 Criterion [128]
Acoustic Noise
Telcordia GR-63 Criterion [125]
Airborne Contaminants, Indoor Levels
Telcordia GR-63 Criteria [126, 127]
Airborne Contaminants, Outdoor Levels
Telcordia GR-63 Criteria [74, 76]
Altitude
Telcordia GR-63 Criteria [110-112, 114, 115, 117,
119]
Earthquake Zone 4
Telcordia Technologies GR-1089-CORE
Electromagnetic Compatibility and Electrical Safety
Telcordia GR-63 Criteria [72, 73]
Operational Thermal, Operating Conditions
Telcordia GR-63 Criteria [72, 73]
Operational Thermal, Short-term Conditions
Telcordia GR-63 Criteria [69-71, 107-109, 124]
Storage Environments, and Transportation and Handling
Telcordia GR-63 Criteria [77, 79]
Thermal Heat Dissipation
Telcordia Technologies GR-1089-CORE
Electromagnetic Compatibility and Electrical Safety
FCC 47 CFR, PART 15, CLASS A
Radiated Emissions (Electric Field)
ETSI EN 300 386 v1.4.1
Electromagnetic Compatibility
ESTI EN 300 019, ETSI EN 300 753
Environmental Conditions and Environmental Tests for
Telecommunications Equipment
Chassis Air Flow
Air flow within the ASR 5500 complies with Telcordia recommendations to ensure vertical convection cooling
of the system.
As shown in the figure below, the lower fan trays pull ambient air inward from the front and side intake vents
located near the bottom of the chassis. The air absorbs heat from system components as it passes over them.
The upper fan trays pull heated air up through the chassis and exhaust it through the side and rear exhaust
vents located near the top rear of the chassis.
ASR 5500 Installation Guide
18
Technical Specifications
Chassis Air Flow
Summary of Contents for ASR 5500
Page 12: ...ASR 5500 Installation Guide xii Contents ...
Page 16: ...ASR 5500 Installation Guide xvi About this Guide Contacting Customer Support ...
Page 40: ...ASR 5500 Installation Guide 24 Technical Specifications Chassis Grounding ...
Page 74: ...ASR 5500 Installation Guide 58 Card Installation Save Shipping Cartons ...
Page 88: ...ASR 5500 Installation Guide 72 MIO Port Cabling Cleaning Fiber Optic Connectors ...
Page 112: ...ASR 5500 Installation Guide 96 System Power up show leds Command ...
Page 130: ...ASR 5500 Installation Guide 114 Initial System Configuration Additional Configuration Tasks ...
Page 164: ...ASR 5500 Installation Guide 148 Replaceable Components Returning Failed Components ...
Page 186: ...ASR 5500 Installation Guide 170 Console Port to Cisco Server Cabling Configuration ...
Page 192: ...ASR 5500 Installation Guide 176 RMA Shipping Procedures Rear Cards ...