4-41
Cisco Broadband Cable Command Reference Guide
OL-1581-08
Chapter 4 Commands for the Cisco uBR10012 Router
redundancy reload
The following example shows how to reload both PRE1 modules:
Router#
redundancy reload shelf
Reload the entire shelf [confirm]
y
Preparing to reload entire shelf
Note
Pressing
enter
or
y
confirms the action and begins the reload of both modules. Pressing any other key
aborts the reload and returns control to the current active PRE1 module.
Related Commands
Command
Description
associate
Associates two line cards for Automatic Protection Switching (APS)
redundancy protection.
redundancy
Enters redundancy configuration mode so that the synchronization
parameters can be configured.
redundancy
force-failover
main-cpu
Forces a switchover, so that the standby Performance Routing Engine
(PRE1) module becomes the active PRE1 module.
redundancy
switch-activity
Forces a switchover to the standby PRE module.