2-11
Catalyst 2350 Switch Hardware Installation Guide
OL18479-01
Chapter 2 Switch Installation
Installing the Switch
Table- or Shelf-Mounting
Locate the adhesive strip with the rubber feet in the mounting-kit envelope. Attach the four rubber feet
to the recessed areas on the bottom of the chassis.
Remove two Phillips truss-head screws from the switch side panels and use those screws to attach the
brackets to the switch (
). Secure the brackets to the table or shelf with the appropriate
hardware.
Caution
Do not use the 19-inch brackets to wall-mount the switch. The brackets are not suitable for
wall-mounting.
Figure 2-5
Attaching the 19-inch Brackets for Table- or Shelf-Mounting
When you complete the switch installation, see the
“After Installing the Switch” section on page 2-11
for more information switch configuration.
After Installing the Switch
You might need to:
•
Configure the switch by running Express Setup to enter the initial switch configuration. For
instructions, see the switch getting started guide that shipped with the switch and also on Cisco.com.
•
Use the CLI setup program to enter the initial switch configuration. See
the Switch with the CLI-Based Setup Program.”
•
Connect to the front-panel ports. See the
“Installing Devices in 10-Gigabit Ethernet Slots” section
“Connecting Devices to the Ethernet Ports” section on page 2-16
1
User-supplied screws
2
Phillips truss-head screws
AC OK
PS OK
100-240V~
1.0-5A
50-60 HZ
273897
2
1