C H A P T E R
2-1
Catalyst 3550 Multilayer Switch Hardware Installation Guide
78-11358-03
2
Installing and Starting the Switch
This chapter describes how to install and start your switch, make connections to
the switch, and how to interpret the power-on self-test (POST) that ensures proper
operation. Read the topics and perform the procedures in the order that they are
presented:
•
Preparing for Installation, page 2-2
•
Installing the Switch, page 2-8
•
Installing the GBIC Modules, page 2-22
•
Powering On the Switch, page 2-24
•
Connecting to the 10/100 and 10/100/1000 Ports, page 2-34
•
Connecting to 100BASE-FX Ports, page 2-36
•
Connecting to the GBIC Module Ports, page 2-38
•
Connecting a PC or Terminal to the Console Port, page 2-40
•