Figure 51: Inserting the Supervisor Card into the Chassis
Step 6
Simultaneously pivot both the spring-loaded ejectors towards the faceplate until they make contact with the faceplate.
Figure 52: Closing the Spring-Loaded Ejectors on the Supervisor Card
Cisco Converged Broadband Routers Hardware Installation Guide
96
Installing the Supervisor in the Cisco cBR Chassis
Installing the Supervisor Card in the Cisco cBR Chassis