Figure 48: Securing the PM to the Shelf
Step 4
Fill the power shelf to the required configuration.
What to do next
After the modular configuration PMs are installed in the chassis, install power module slot covers in empty
PM slots, if any. For more information, see
Installing a Power Module Slot Cover
.
Removing a Modular Configuration Power Module
This section describes how to remove a PM from a modular configuration power shelf.
Cisco CRS Routers 16-Slot Line Card Chassis Installation Guide
87
Installing and Removing Power Components
Removing a Modular Configuration Power Module