2-7
Installation Guide for Cisco Secure ACS Solution Engine 4.1
OL-9969-03
Chapter 2 Preparing for Installation
Preparing Your Site for Installation
Creating a Safe Environment
Follow these guidelines to create a safe operating environment:
•
Keep tools and chassis components off the floor and away from foot traffic.
•
Clear the area of possible hazards, such as moist floors, ungrounded power extension cables, and
missing safety grounds.
•
Keep the area around the chassis free from dust and foreign conductive material (such as metal
flakes from nearby construction activity).
AC Power
Ensure that the plug-socket combination is accessible at all times, because it serves as the main
disconnecting device. For the ACS SE power requirements, see
Appendix A, “Technical Specifications
for the Cisco 1113.”
Warning
This product requires short-circuit (overcurrent) protection to be provided as part of the building
installation. Install only in accordance with national and local wiring regulations.
Cabling
Use the cables in the accessory kit to connect the ACS SE console port to a console or computer that is
running a console program. In addition to using the console cable, use the provided standard Ethernet
cable to connect the ACS SE to your network. For information detailing cable requirements, see
Back Panel Features for the Cisco 1113, page 1-5
.