Chapter 2 Installing the GoQAM
28
4004834 Rev D
3
Insert the terminal block connector into the terminal block on the back panel of
the 48 V DC GoQAM.
4
Keep the DC power source set to the
Off
position until you are ready to power
on the modulator.
5
Go to
Connect the DVB ASI Input Ports
(on page 29).
Connecting an AC Power Source
Complete the following steps to connect an AC power source to the 120/230 V AC
GoQAM.
1
Verify that the power switch on the back panel is placed in the
Off
position.
2
Connect the power cord to the AC power inlet on the back panel of the 120/230
V AC GoQAM.
3
Connect the other end of the power cord to an AC electrical outlet.
4
Keep the power switch in the
Off
position until you are ready to power on the
device.
5
Go to
Connect the DVB ASI Input Ports
(on page 29).
Summary of Contents for GoQAM
Page 1: ...GoQAM Modulator RF Output and IF Output Hardware Installation and Operation Guide ...
Page 2: ......
Page 8: ......
Page 14: ......
Page 30: ......
Page 52: ......
Page 67: ...Provision GoQAMs on the DNCS 4004834 Rev D 51 ...
Page 68: ......
Page 116: ......
Page 138: ......
Page 164: ......
Page 176: ......