B-29
Cisco IE 3000 Switch Hardware Installation Guide
Appendix B Installation In a Hazardous Environment
Installing the Switch
Disconnect Power
After successfully running POST, follow these steps.
Step 1
Turn off power to the switch.
Step 2
Disconnect the cables.
Step 3
Decide where you want to install the switch.
Installing the Switch
These sections describes how to install the switch:
•
Installing the Switch on a DIN Rail
•
Installing the Switch on a Wall
•
Installing the Switch in a Rack
Warning
This equipment is supplied as “open type” equipment. It must be mounted within an enclosure that is
suitably designed for those specific environmental conditions that will be present and appropriately
designed to prevent personal injury resulting from accessibility to live parts. The interior of the
enclosure must be accessible only by the use of a tool.
The enclosure must meet IP 54 or NEMA type 4 minimum enclosure rating standards. Statement 1063
Warning
When used in a Class I, Division 2, hazardous location, this equipment must be mounted in a suitable
enclosure with proper wiring method, for all power, input and output wiring, that complies with the
governing electrical codes and in accordance with the authority having jurisdiction over Class I,
Division 2 installations. Statement 1066
Caution
To prevent the switch from overheating, ensure these minimum clearances:
– Top and bottom: 4.13 in. (105 mm)
– Exposed side (not connected to the module): 3.54 in. (90 mm)
– Front: 2.56 in. (65 mm)