•
Removing and Installing Components, on page 11
Preinstallation
This section includes the following information:
Installation Options
The Cisco MDS 9396S Switch can be installed using the following methods:
• In an open EIA rack, using:
• The rack-mount kit shipped with the switch
• The Telco and EIA Shelf Bracket Kit (an optional kit, purchased separately) in addition to the
rack-mount kit shipped with the switch
• In a perforated or solid-walled EIA cabinet, using:
• The rack-mount kit shipped with the switch
• The Telco and EIA Shelf Bracket Kit (an optional kit, purchased separately) in addition to the
rack-mount kit shipped with the switch
For instructions on installing the switch using the optional, separately purchased Telco and EIA Shelf Bracket
Kit, see the
Cisco MDS 9000 Family Telco and EIA Shelf Bracket
section.
The Telco and EIA Shelf Bracket Kit is optional and is not provided with the switch. To order the kit, contact
your switch provider.
Note
Installation Guidelines
Follow these guidelines when installing the Cisco MDS 9396S Switch:
• Plan your site configuration and prepare the site before installing the switch. The recommended site
planning tasks are listed in the
Site Planning and Maintenance Records
section.
• Ensure there is adequate space around the switch to allow for servicing the switch and for adequate
airflow (airflow requirements are listed the
section).
• Ensure the air-conditioning meets the heat dissipation requirements listed the
section.
• Ensure the cabinet or rack meets the requirements listed in the
section.
Installing the Cisco MDS 9396S Switch
2
Installing the Cisco MDS 9396S Switch
Preinstallation