![background image](http://html.mh-extra.com/html/cisco/mem-c6knam-2gb/mem-c6knam-2gb_upgrade-installation_67436013.webp)
13
Network Analysis Module Memory Upgrade Installation Note
78-18630-01B0
Installing the NAM
Step 4
Depending on the orientation of the slots in the chassis (horizontal or vertical), perform one of the
following two sets of steps:
Chassis with horizontal slots
a.
Position the NAM in the slot. (See
.) Make sure that you align the sides of the NAM carrier
with the slot guides on each side of the chassis slot.
b.
Carefully slide the NAM into the slot until the EMI gasket along the top edge of the NAM makes
contact with the module or cover plate in the slot above it and the NAM ejector levers have both
closed to approximately 45 degrees with respect to the NAM faceplate. (See
.)
Figure 5
Positioning the NAM in a Horizontal Slot Chassis
187447
INPUT
OK
FAN
OK
OUTPUT
FAIL
o
INPUT
OK
FAN
OK
OUTPUT
FAIL
o
1
2
3
FAN
STATUS
4
5
6
SUPERVISOR2
WS-X6K-SUP2-2GE
ST
AT
U
S
SY
ST
EM
C
O
N
SO
LE
PW
R
M
G
M
T
R
ES
ET
CONSOLE
CONSOLE
PORT
MODE
PCMCIA
EJECT
PORT 1
PORT 2
Switch Load
100%
1%
EMI gasket
EMI gasket
Insert module
between slot guides
Ejector lever fully
extended
4
3
5
5
4
6
6
SUPERVISOR2
WS-X6K-SUP2-2GE
ST
AT
U
S
SY
ST
EM
C
O
N
SO
LE
PW
R
M
G
M
T
R
ES
ET
CONSOLE
CONSOLE
PORT
MODE
PCMCIA
EJECT
PORT 1
PORT 2
Switch Load
100%
1%
NETWORK ANALYSIS MODU
LE
WS-SVC-NAM-2
ST
AT
US
NETWORK ANALYSIS MODULE
SHUTDOWN
WS-SVC-NAM-2
ST
ATUS