Figure 20: Line Cards fitted with Fiber Management Bracket
Figure 21: Filler Cards fitted with Fiber Management Bracket
In ETSI racks, to maintain a footprint of 600 mm, the cabinet door cannot be installed and the horizontal bar
of the fiber management bracket should be maintained at the shortest length. See
.
Note
Hardware Installation Guide for Cisco NCS 1004
22
Install Cisco NCS 1004
Install NCS 1004 on an EIA/ANSI/ ETSI Rack