To accommodate equipment racks with different mounting-hole patterns, the chassis mounting brackets have
groups of screw holes on either side. The mounting holes in these rails are spaced so that one hole in each hole
group aligns with a hole in the equipment rack or the optional center-mount bracket. Use the corresponding
mounting hole (in the same hole group) on the opposite side of the chassis to level the chassis in the rack.
Note
Step 7
Use the screwdriver to fully tighten the screws.
Attaching the Chassis Door
If the front door was removed earlier, install it after the chassis is installed on the rack. For door installation
details, see the “Replacing the Front Door” section in the Cisco Network Convergence System 4000 Series
Hardware Installation Guide .
Unpacking Chassis Component Shipping Pallets
The remaining shipping boxes and pallets are now ready to be delivered from receiving/shipping dock to the
final location of the chassis.
Steps
To unpack the pallets, follow these steps:
SUMMARY STEPS
1.
If possible, move the pallets to the same location as the unpacked and secured chassis. If not possible,
move the individual boxes containing the various components to the chassis location.
2.
Unpack all primary pallet parts from the packaging, and set the parts carefully aside for installation.
3.
Unpack all secondary pallet parts from packaging, and set the parts carefully aside for installation.
4.
Unpack all power components from the packaging, and set the parts carefully aside on an electrostatic
discharge (ESD)-immune surface for installation.
5.
Unpack all cosmetic parts from the packaging and set the parts carefully aside.
DETAILED STEPS
Step 1
If possible, move the pallets to the same location as the unpacked and secured chassis. If not possible, move the individual
boxes containing the various components to the chassis location.
Step 2
Unpack all primary pallet parts from the packaging, and set the parts carefully aside for installation.
Take appropriate precautions for the sensitive optical components that are shipped with the chassis.
Note
Step 3
Unpack all secondary pallet parts from packaging, and set the parts carefully aside for installation.
Do not unpack individual cards until you are ready to install the cards in the chassis.
Note
Step 4
Unpack all power components from the packaging, and set the parts carefully aside on an electrostatic discharge
(ESD)-immune surface for installation.
Securing the Chassis
22
Securing the Chassis
Attaching the Chassis Door