Figure 35: NCS-57C3-MOD Ground Lug
Pan-head screws
2
Grounding lug
1
c) Attach one end of the shelf ground cable (#6 AWG cable) to the grounding cover plate using the specified dual-hole
lug connector.
Step 5
Tighten the pan-head screws to torque value of 11.5 in-lbs (1.3 N-m).
Step 6
Ensure that the lug and cable do not interfere with other equipment.
Step 7
Prepare the other end of the grounding cable and connect it to an appropriate grounding point in your site to ensure
adequate earth ground.
Connect AC Power to the Chassis
The chassis relies on the protective devices in the building installation to protect against short circuit,
overcurrent, and ground faults. Ensure that the protective devices comply with local and national electrical
codes.
Caution
Install the Chassis
37
Install the Chassis
Connect AC Power to the Chassis