grounding points are also referred to as Network Equipment Building System (NEBS) bonding and grounding
point, and are provided to satisfy the Telcordia NEBS safety requirements.
Figure 21: NEBS Bonding and Grounding Points
—
Rear Side of the FCC
NEBS bonding and grounding point (lower)
2
NEBS bonding and grounding points (upper)
1
Do not remove the FCC ground cable unless the FCC is being replaced.
Caution
Required Tools and Equipment
You will need to provide the following tools and equipment:
•
Number-2 Phillips screwdriver
•
Ground lug
•
Ground cable
Cisco Network Convergence System 6000 Fabric Card Chassis Hardware Installation Guide
36
Installing the Power Components
Installing the Fabric Card Chassis Ground Cable