A-1
Cisco MGX 8240 Hardware Installation Guide
Release 2.2, 78-10084-01, November 1999
A P P E N D I X
A
Task Lists
Task List for MGX 8240 Private Line Service Gateway
•
Prepare site
•
Unpack/Required tools
•
Inventory parts
•
Check condition
•
Physically mount chassis
•
Check cable length
•
Check air flow ventilation and obstruction
•
Check air for contamination, humidity, and temperature
•
Mount I/O cards (including IMC I/O)
•
Mount PSM cards and IMC card
•
Connect bits clocks (if necessary)
•
Check voltage
•
Install power
•
Connect power from chassis to power source
•
Check fuses (if used)
•
Check voltage
•
Check Ready LED
•
Configure PC/terminal
•
Check software versions and revisions
•
Perform FDOS
Task List for Common Interface Module
•
Prepare site
•
Unpack/Required tools
•
Inventory parts