10-5
Cisco Nexus 7000 Series Hardware Installation and Reference Guide
OL-23069-07
Chapter 10 Installing or Replacing Components
Replacing an AC Power Supply Unit During Operations
Figure 10-1
Repacking a 6-kW AC Power Supply Unit
1
Open the box.
5
Insert a foam cushion onto the top of the
power supply unit.
2
Insert a foam cushion.
6
Fold the two narrow flaps over the top
cushion.
3
Insert the cardboard holder with the U-shaped
end facing upwards.
7
Fold the two wide flaps over the top of the
box.
4
Insert the power supply unit with the small
end going in the box first.
8
Tape the wide flaps together and to the box.
Summary of Contents for Nexus 7004
Page 12: ...Contents xii Cisco Nexus 7000 Series Hardware Installation and Reference Guide OL 23069 07 ...
Page 19: ... xix Cisco Nexus 7000 Series Hardware Installation and Reference Guide OL 23069 07 ...
Page 22: ... xxii Cisco Nexus 7000 Series Hardware Installation and Reference Guide OL 23069 07 ...