A-27
Cisco Nexus 7000 Series Hardware Installation and Reference Guide
OL-23069-07
Appendix A Technical Specifications
Chassis Clearances
Figure A-17
Clearances Required for a Front-Mounted Cisco Nexus 7009 Chassis in a Four-Post
Rack
14
15
17
16
18
10
11
12
30403
8
8
9
5
3
3
3
3
17.3 in
(43.9 cm)
24.0 in
(61.0 cm)
7.5 in
(19.1 cm)
24.0 in
(61.0 cm)
2
8
.0 in
(71.1 cm)
6
7
1
2
5.0 in
(12.7 cm)
4
4
4
4
1
Cisco Nexus 7009 chassis
10
Left side clearance required with an
unobstructed opening to the hot aisle to
exhaust air
2
Cable management frames
11
Chassis width
3
Vertical rack-mount post
12
Side clearance recommended for cabinet
installations:
•
use 11 inches (27.9 cm)
4
Vertical rack-mount post for neighboring rack
13
Side clearance recommended for open rack
installations:
•
If next to another open rack, use 6 inches
(15.2 cm).
•
If next to a wall, use 11 inches (27.9 cm).
5
Nearest object or inside of cabinet
14
Rear service clearance required to replace fan
trays and fabric modules
6
Air intake from cold aisle for the power
supplies
15
Airflow clearance required between the
chassis rear and inside of cabinet (if used)
Summary of Contents for Nexus 7004
Page 12: ...Contents xii Cisco Nexus 7000 Series Hardware Installation and Reference Guide OL 23069 07 ...
Page 19: ... xix Cisco Nexus 7000 Series Hardware Installation and Reference Guide OL 23069 07 ...
Page 22: ... xxii Cisco Nexus 7000 Series Hardware Installation and Reference Guide OL 23069 07 ...