3-4
Cisco Nexus 7000 Series Hardware Installation and Reference Guide
OL-23069-07
Chapter 3 Installing a Cisco Nexus 7009 Chassis
Installing the Bottom-Support Rails on the Rack
–
Left and right center-mount vertical mounting brackets
•
Door and air intake frame (optional)
Step 2
Check the contents of each box or package for damage.
Step 3
If you notice any discrepancies or damage, send the following information to your customer service
representative by e-mail:
•
Invoice number of the shipper (see the packing slip)
•
Model and serial number of the missing or damaged unit
•
Description of the problem and how it affects the installation
Installing the Bottom-Support Rails on the Rack
You can use the following two types of bottom-support rails to install and hold a Cisco Nexus 7009
chassis to its rack:
•
Front-mount bottom-support rails
•
Center-mount bottom-support rails (part number N7K-C7009-CMK)
Typically, you use the two front-mount bottom-support rails in the Bottom Support Kit (part of the Cisco
Nexus 7009 Accessory Kit or ordered separately as part number N7K-C7009-BSK). If you additionally
ordered the Center Mount Kit (part number N7K-C7009-CMK) for centering the chassis on a two-post
rack, you will receive an additional kit with two center-mount bottom support rails and two center-mount
rail mounting brackets. You must install either the front-mount bottom-support rails or the center-mount
bottom-support rails before installing the chassis.
Note
If you are installing three Cisco Nexus 7009 chassis with front-mount brackets in a 42-RU rack and you
can safely position the bottom chassis at the lowest RU using a mechanical lift, you can fasten the chassis
directly to the rack or cabinet with the maximum number of screws. After you install the bottom chassis,
you can slide the additional chassis onto the fully installed lower chassis (without using additional
bottom-support rails) and then fasten the upper chassis to the rack. This process enables you to install
three 14-RU Cisco Nexus 7009 chassis in a 42-RU rack. If you do not need to install three chassis in a
42 RU rack, we recommend that you always install each chassis on its own set of bottom-support rails.
Note
When you install a Cisco Nexus 7009 chassis with center-mount brackets, you must always install the
chassis onto center-mount bottom-support rails.
Caution
Do not remove the center-mount brackets when a chassis is installed on them. They are required at all
times for holding a center-mount chassis to the rack.
The prerequisites, tools, and process for installing the bottom-support rails are included in the following
topics:
•
Prerequisites for Attaching the Bottom-Support Rails, page 3-5
•
Required Tools and Equipment, page 3-5
Summary of Contents for Nexus 7004
Page 12: ...Contents xii Cisco Nexus 7000 Series Hardware Installation and Reference Guide OL 23069 07 ...
Page 19: ... xix Cisco Nexus 7000 Series Hardware Installation and Reference Guide OL 23069 07 ...
Page 22: ... xxii Cisco Nexus 7000 Series Hardware Installation and Reference Guide OL 23069 07 ...