S e n d d o c u m e n t c o m m e n t s t o n e x u s 7 k - d o c f e e d b a c k @ c i s c o . c o m
E-20
Cisco Nexus 7000 Series Hardware Installation and Reference Guide
OL-23069-06
Appendix E Repacking the Cisco Nexus 7000 Series Switch for Shipment
Repacking the System Components
Figure E-9
Packing the Front Door
f.
Fold the box flaps over the door and tape them in place.
g.
Loosen and remove the eight screws holding the bottom hinge bracket for the door. Four of the
screws are attached to the right and left side of the cable management frame (two screws on each
side) and four of the screws are attached to the chassis (see
). Place the screws in a small
parts bag.
Note
Do not remove the top cover at this time. The top cover is part of the cable management frame.
1
Align the two shorter side cushions to the
shorter inside crease in the center panel of the
box.
4
Fold the two short flaps up along the end side
cushions and then fold them over the top of
the front door.
2
Align the two longer side cushions to the
longer inside crease in the center panel of the
box.
5
Fold the two long flaps up along the side
cushions and then fold them over the top of
the side flaps and door.
3
Place the door in the open space between the
side cushions.
6
Tape the two long flaps together and to the
box with packing tape.