S e n d d o c u m e n t c o m m e n t s t o n e x u s 7 k - d o c f e e d b a c k @ c i s c o . c o m
F-1
Cisco Nexus 7000 Series Hardware Installation and Reference Guide
OL-23069-06
A P P E N D I X
F
Site Preparation and Maintenance Records
This appendix provides a site planning list to use when preparing your site for the Cisco Nexus 7000
Series switch and includes these sections:
•
Site Preparation Checklist, page F-1
•
Contact and Site Information, page F-2
•
Chassis and Module Information, page F-3
Site Preparation Checklist
Planning the location and layout of your equipment rack or cabinet is essential for successful switch
operation, ventilation, and accessibility.
lists the site planning tasks that we recommend that you complete before you install the Cisco
Nexus 7000 Series switch. Your completion of each task ensures a successful switch installation.
Table F-1
Site Planning Checklist
Planning Activity
Verification Time and Date
Space evaluation:
•
Space and layout
•
Floor covering
•
Impact and vibration
•
Lighting
•
Physical access
•
Maintenance access
Environmental evaluation:
•
Ambient temperature
•
Humidity
•
Altitude
•
Atmospheric contamination
•
Airflow