Figure 10: Cable Management Assemblies Attached to the Rack-Mount Brackets
Upper cable management assembly
2
Lower cable management assembly
1
Step 5
Place the top hood (800-31269-01) on top of the two upper cable management assemblies that are already installed.
Make sure that the side of the top hood that is closest to the chassis has two alignment pins that align with the alignment
holes in the chassis as shown in
Figure 11: Positioning the Top Hood with the Upper Cable Management Assemblies
and the Switch Chassis, on page 21
. Push the top hood toward the chassis so that its alignment pins enter the alignment
holes and the top hood rests against the chassis.
Installing a Cisco Nexus 7018 Chassis
20
Installing a Cisco Nexus 7018 Chassis
Installing the Cable Management Frame