Installation Options with Rack-Mount Kits
Unpacking and Inspecting the Switch
Installing the Switch Using the NXK-ACC-KIT-1RU Rack-Mount Kit
Installing the Switch Using the N3K-C3064-ACC-KIT Rack-Mount Kit
Connecting the Switch to the ACI Fabric
C H A P T E R 4
Preparing to Connect to Other Devices
Connecting Leaf Switches to APICs
Connecting Leaf Switches to Spine Switches
Installing a Gigabit Ethernet module (GEM)
Virtual Port Channel Migration - Migration of Nodes from a First-Generation Switch to a
Setting Up an Optional Console Interface
Setting Up an Optional Management Connection
Optic Transceiver Removal Using the Optics Extraction Tool
Maintaining Transceivers and Optical Cables
C H A P T E R 5
Replacing a Power Supply Module
Replacing a High Voltage (HVAC/HVDC) Power Supply
A P P E N D I X A
Cisco Nexus 93108TC-FX ACI Mode Hardware Installation Guide
iv
Contents