1-2
Cisco Service Control Engine 1000 2xGBE Quick Start Guide
OL-7822-06
Chapter 1 Prepare for Installation
Workbench or Tabletop Installation
Tools and Parts
Use the following list of tools and parts as a checklist for preparing for installing the SCE 1000 platform:
•
Appropriate cables to connect the SCE 1000 to the network and console terminal
•
Tape measure (optional)
•
Level (optional)
•
Number 1 Phillips screwdriver
•
Number 2 Phillips screwdriver
•
1/4-inch flat-blade screwdriver
•
1/4-inch hex wrench
•
Grounding kit (shipped with the SCE 1000)
•
12 AWG or 2.5 mm copper installation wire with hex or loop connectors for DC power leads (DC
power only) Ring terminals must be UL approved and suitable for 12 AWG wire.
•
AC power cords (AC power only, shipped with SCE 1000)
•
Rack-mounting kit (shipped with SCE 1000)
–
Spare screws for changing bracket position
Prepare for Rack-Mount Installation
Before you begin the rack-mounting tasks, determine the type of rack—four-post or two-post—that you
will be using.
Workbench or Tabletop Installation
Figure 1-1
Tabletop Installation of the SCE 1000 Platform
For a workbench or tabletop installation, verify the following before installing the SCE 1000 platform:
•
The SCE 1000 platform is off the floor and has adequate ventilation.
Cisco S
CE 100
0
Series
2xGBE
LINK RX
TX
RX
MM
TX
LINK RX
TX
RX
MM
TX
GBE-1
SUB
LINE
NET
PWR B
STATUS
PWR A
BYPASS
10/100/
1000
LINK/
ACTIVE
10/100/
1000
LINK/
ACTIVE
AUX
CONSO
LE
MNG 2
MNG 1
1
2
92967