3-14
Cisco ONS 15454 DWDM Installation and Operations Guide, R6.0
September 2005
Chapter 3 Turn Up a Node
DLP-G56 Provision IP Settings
Step 5
Click
OK
. The network view appears. The node icon appears in gray, during which time you cannot
access the node.
Step 6
Double-click the node icon when it becomes green.
Step 7
Return to your originating procedure (NTP).
Table 3-2
LED Behavior During TCC2/TCC2P Reboot
Reboot Activity
Active TCC2/TCC2P LEDs
Standby TCC2/TCC2P LEDs
Standby TCC2/TCC2P card updated
with new network information.
Memory test (1 to 2 minutes).
If an AIC or AIC-I card is installed,
AIC FAIL and alarm LEDs light up
briefly when the AIC is updated.
The standby TCC2/TCC2P becomes
the active TCC2/TCC2P.
ACT/STBY: Flashing green.
1.
ACT/STBY: Flashing yellow.
2.
FAIL LED: Solid red.
3.
All LEDs on except ACT/STBY.
4.
CRIT turns off.
5.
MAJ and MIN turn off.
6.
REM, SYNC, and ACO turn off.
7.
All LEDs (except A&B PWR)
turn off (1 to 2 minutes).
8.
ACT/STBY: Solid yellow.
9.
Alarm LEDs: Flash once.
10.
ACT/STBY: Solid green.
Memory test (1 to 2 minutes).
TCC2/TCC2P updated with new
network information.
The active TCC2/TCC2P becomes the
standby TCC2/TCC2P.
1.
All LEDs: Turn off (1 to 2 minutes).
CTC displays “Lost node connection,
switching to network view” message.
2.
FAIL LED: Solid red.
3.
FAIL LED: Flashing red.
4.
All LEDs on except ACT/STBY.
5.
CRIT turns off.
6.
MAJ and MIN turn off.
7.
REM, SYNC, and ACO turn off; all
LEDs are off.
8.
ACT/STBY: Solid yellow.
9.
ACT/STBY: Flashing yellow.
10.
ACT/STBY: Solid yellow.
ACT/STBY: Solid green.
Summary of Contents for ONS 15454 DWDM
Page 38: ...Figures xxxviii Cisco ONS 15454 DWDM Installation and Operations Guide R6 0 August 2005 ...
Page 54: ...Procedures liv Cisco ONS 15454 DWDM Installation and Operations Guide R6 0 August 2005 ...
Page 64: ... 64 Cisco ONS 15454 DWDM Installation and Operations Guide R6 0 August 2005 Chapter ...