3-83
Cisco ONS 15454 DWDM Installation and Operations Guide, R6.0
September 2005
Chapter 3 Turn Up a Node
NTP-G37 Run Automatic Node Setup
The Import NE Update From File dialog box closes, and the MetroPlanner configuration settings are
imported.
Step 7
Verify that the imported parameters are correct according to the printout of the MetroPlanner parameters
file, then click
Apply
.
Stop
.
You have completed this procedure
.
NTP-G37 Run Automatic Node Setup
Step 1
Complete the
“DLP-G46 Log into CTC” task on page 2-25
at the node where you want to run ANS. If
you are already logged in, continue with
Step 2
Referring to the Cisco MetroPlanner Installation Parameters (see
), identify the
parameters that have a Yes in the Manually Set column. If there are no parameters that have a Yes in the
Manually Set column, continue with
Step 3
In CTC, display the card where the parameter is to be provisioned in card view.
Step 4
Enter the specified Calibration parameter from the Cisco MetroPlanner Installation Parameters table.
Click
Apply
.
Step 5
Repeat Steps
through
for all parameters in the Cisco MetroPlanner Installation Parameters table that
display Yes in the Manually Set field.
Step 6
Change to node view.
Step 7
Click the
Provisioning > WDM-ANS > Port Status
tabs.
Step 8
Click
Launch ANS
.
Step 9
In the Apply Launch ANS dialog box, click
Yes
.
Step 10
In the Launch ANS confirmation dialog box, click
OK
.
Step 11
Verify that one of the following statuses appears in the Link Status column for all ports:
•
Success - Changed—The parameter setpoint was recalculated successfully.
•
Success - Unchanged—The parameter setpoint did not need recalculation.
•
Not Applicable—The parameter setpoint does not apply to this node type.
If one of the following statuses is shown, complete the provided instructions:
Purpose
This procedure runs the CTC DWDM ANS function. ANS adjusts the
values of the variable optical attenuators (VOAs) to equalize the
per-channel power at the amplifier level.
Tools/Equipment
The Cisco MetroPlanner Installation Parameters file
Prerequisite Procedures
NTP-G36 Calculate Cable Connections, page 3-80
NTP-G138 Import a Cisco MetroPlanner Configuration File, page 3-82
NTP-G139 Verify Cisco MetroPlanner Reports and Files, page 3-3
Required/As Needed
Required
Onsite/Remote
Onsite or remote
Security Level
Superuser
Summary of Contents for ONS 15454 DWDM
Page 38: ...Figures xxxviii Cisco ONS 15454 DWDM Installation and Operations Guide R6 0 August 2005 ...
Page 54: ...Procedures liv Cisco ONS 15454 DWDM Installation and Operations Guide R6 0 August 2005 ...
Page 64: ... 64 Cisco ONS 15454 DWDM Installation and Operations Guide R6 0 August 2005 Chapter ...