4-2
Cisco ONS 15454 DWDM Installation and Operations Guide, R6.0
September 2005
Chapter 4 Perform Node Acceptance Tests
NTP-G41 Perform the Terminal or Hub Node with 32MUX-O and 32DMX-O Cards Acceptance Test
9.
—Complete this procedure to test OADM nodes with OSC-CSM and OPT-BST
cards installed on both the east and west sides of the shelf.
10.
—Complete this procedure to test OADM nodes with OSC-CSM cards installed on
both the east and west sides of the shelf and no OPT-BST cards.
NTP-G41 Perform the Terminal or Hub Node with 32MUX-O and
32DMX-O Cards Acceptance Test
Note
This procedure tests the west side of hub nodes first, then the east side. If you are testing a terminal node,
apply instructions for the west side of the hub node to the terminal side (east or west) of the terminal
node.
Step 1
Complete the
“DLP-G46 Log into CTC” task on page 2-25
at the hub or terminal node that you want to
test. If you are already logged in, continue with
Step 2
From the View menu, choose
Go to Network View
.
Step 3
Click the
Alarms
tab.
a.
Verify that the alarm filter is not on. See the
“DLP-G128 Disable Alarm Filtering” task on page 8-28
as necessary.
b.
Verify that no equipment (EQPT) alarms appear indicating equipment failure or other hardware
problems. If equipment failure alarms appear, investigate and resolve them before continuing. Refer
to the
Cisco ONS 15454 Troubleshooting Guide
or the
Cisco ONS 15454 SDH Troubleshooting
Guide
for procedures.
Note
If optical service channel (OSC) terminations are created, there will be two alarms, one for
low power on the OPT-BST card, and the other an OSC channel alarm.
Step 4
In node view, click the
Provisioning
>
WDM-ANS
>
Port Status
tabs. Verify that all statuses under
Link Status are listed as Success - Changed, Success - Unchanged, or Not Applicable. If any are not,
complete the
“NTP-G37 Run Automatic Node Setup” procedure on page 3-83
.
Purpose
This procedure tests a DWDM terminal or hub node with 32MUX-O and
32DMX-O cards.
Tools/Equipment
A tunable laser or eight TXP_MR_2.5G cards covering the 32 C-band
wavelengths (see
An optical power meter or optical spectrum analyzer
2 bulk attenuators (10 dB) with LC connectors
Prerequisite Procedures
Required/As Needed
Required
Onsite/Remote
Onsite
Security Level
Superuser
Summary of Contents for ONS 15454 DWDM
Page 38: ...Figures xxxviii Cisco ONS 15454 DWDM Installation and Operations Guide R6 0 August 2005 ...
Page 54: ...Procedures liv Cisco ONS 15454 DWDM Installation and Operations Guide R6 0 August 2005 ...
Page 64: ... 64 Cisco ONS 15454 DWDM Installation and Operations Guide R6 0 August 2005 Chapter ...