4-15
Cisco ONS 15454 DWDM Installation and Operations Guide, R6.0
September 2005
Chapter 4 Perform Node Acceptance Tests
DLP-G310 Verify ROADM Node Pass-Through Channels
Step 21
Verify the west 32WSS card to OPT-BST, OPT-PRE, or OSC-CSM card cable connection:
a.
Display the west 32WSS in card view.
b.
Click the
Provisioning > Optical Line > Parameters
tabs.
c.
Locate the Port 68 Power parameter. Record the value.
d.
If an west OPT-PRE is installed, display it in card view, and complete Step
. If not, continue with
Step
.
e.
Click the
Provisioning > Opt.Ampli.Line > Parameters
tabs and read the Total Output Power
value for Port 2, then continue with Step
f.
If an west OPT-BST card is installed, display it in card view, and complete Step
. If not, continue
with Step
g.
Click the
Provisioning > Opt.Ampli.Line > Parameters
tabs and read the Power value for Port 3,
then continue with Step
h.
Display the west OSC-CSM card in card view, click the
Provisioning > Opt.Ampli.Line >
Parameters
tabs and read the Power value for Port 2, then continue with Step
i.
Verify that the value in Step
,
matches the power recorded in Step
, +/–1.5 dB. If not, use
the
“NTP-G115 Clean Fiber Connectors” procedure on page 13-25
to clean the fiber connection
between the 32WSS card and the OPT-PRE, OPT-BST or OSC-CSM card.
Step 22
Verify the EXPRESS cable connection between the two 32WSS cards:
a.
Display the west 32WSS in card view.
b.
Click the
Provisioning > Optical Line > Parameters
tabs.
c.
Locate the Port 65 Power parameter. Record the value.
a.
Display the east 32WSS in card view.
b.
Click the
Provisioning > Optical Line > Parameters
tabs.
c.
Locate the Power value for Port 66. Verify that the value matches the power recorded in Step
“NTP-G115 Clean Fiber Connectors” procedure on page 13-25
to clean the
fiber connection between the 32WSS cards.
Step 23
Display the east 32WSS card in card view.
Step 24
Click the
Provisioning
>
Optical Chn Optical Connector [n]
>
Parameters
tabs, where n = the
connector number containing the wavelength you are testing. Refer to
, if needed.
Step 25
Wait approximately 60 seconds, then locate the Power and VOA Power Ref parameters for the tested PT
port. Verify that the Power value is equal to the VOA Power Ref value, +/–1.5 dBm. If the Power value
is not equal to the VOA Power Ref value +/–1.5 dBm, check your connections and clean the fibers from
the 32WSS card to the patch panel and from the patch panel to the TXP card using the
Fiber Connectors” procedure on page 13-25
. Then, repeat
. If this does not change the power
value, consult your next level of support.
Step 26
If an OPT-BST card is installed on the east side, complete the following steps. If not, continue with
a.
Display the east OPT-BST in card view.
b.
Click the
Provisioning > Optical Line > Parameters
tabs.
c.
Locate the Port 1 Power parameter. Record the value.
d.
Display the east 32WSS in card view.
e.
Click the
Provisioning > Optical Line > Parameters
tabs.
Summary of Contents for ONS 15454 DWDM
Page 38: ...Figures xxxviii Cisco ONS 15454 DWDM Installation and Operations Guide R6 0 August 2005 ...
Page 54: ...Procedures liv Cisco ONS 15454 DWDM Installation and Operations Guide R6 0 August 2005 ...
Page 64: ... 64 Cisco ONS 15454 DWDM Installation and Operations Guide R6 0 August 2005 Chapter ...