4-58
Cisco ONS 15454 DWDM Installation and Operations Guide, R6.0
September 2005
Chapter 4 Perform Node Acceptance Tests
DLP-G94 Verify Add and Drop Connections on OADM Node with OSC-CSM Cards
c.
Modify the COM TX Fail Low Threshold. Change the Port 3 opwrMin (minimum power) to
–30 dBm.
d.
If the OSC link turns up, continue with
. If it does not turn up, replace the OSC-CSM card.
Step 19
Check the site configuration file from Cisco MetroPlanner and identify the wavelength (belonging to the
100 Ghz ITU-T grid) of the channel running on the first add path of the first AD-xC-xx.x-E or
4MD-xx.x-E card on the west-to-east direction.
Step 20
Connect the tunable laser to the correspondent 15xx.x RX port (on the card front panel) of the east
AD-xC-xx.x-E or east 4MD-xx.x-E card.
Step 21
Repeat Steps
through
, applying the steps to the west-to-east direction.
Step 22
Restore the default administrative state (IS,AINS/Unlocked,automaticInService) on all the ports
previously set to
OOS,MT
(ANSI) or
Locked,maintenance
(ETSI).
Step 23
Launch ANS to recover the correct node configuration.
Step 24
Return to your originating procedure (NTP).
Summary of Contents for ONS 15454 DWDM
Page 38: ...Figures xxxviii Cisco ONS 15454 DWDM Installation and Operations Guide R6 0 August 2005 ...
Page 54: ...Procedures liv Cisco ONS 15454 DWDM Installation and Operations Guide R6 0 August 2005 ...
Page 64: ... 64 Cisco ONS 15454 DWDM Installation and Operations Guide R6 0 August 2005 Chapter ...