Perform Node Acceptance Tests
This chapter provides test procedures to verify that the cards installed in the ONS 15454 are performing
correctly. The procedures are optional.
Note
Unless otherwise specified, “ONS 15454” refers to both ANSI (SONET) and ETSI (SDH) shelf
assemblies.
Before You Begin
This section lists the non-trouble procedures (NTPs) that you need to complete to validate a dense
wavelength division multiplexing (DWDM) node. Turn to a procedure for applicable detailed level
procedures (DLPs).
1.
NTP-G41 Perform the Terminal or Hub Node with 32MUX-O and 32DMX-O Cards Acceptance
Test, page 4-2
—Complete this procedure to test terminal and hub nodes with 32MUX-O and
32DMX-O cards installed.
2.
NTP-G42 Perform the Terminal Node with 32WSS and 32DMX Cards Acceptance Test, page
4-5
—Complete this procedure to test terminal nodes with 32WSS and 32DMX cards installed.
3.
NTP-G43 Perform the ROADM Node Acceptance Test, page 4-8
—Complete this procedure to test
reconfigurable optical add/drop multiplexing (ROADM) nodes.
4.
NTP-G44 Perform the Anti-ASE Hub Node Acceptance Test, page 4-20
—Complete this procedure
to test anti-amplified spontaneous emission (anti-ASE) hub nodes.
5.
NTP-G45 Perform the Line Amplifier Node with OSCM Cards Acceptance Test, page
4-23
—Complete this procedure to test line amplifier nodes with OSCM cards installed on both the
east and west sides of the shelf.
6.
NTP-G46 Perform the Line Amplifier Node with OSC-CSM Cards Acceptance Test, page
4-26
—Complete this procedure to test line amplifier nodes with OSC-CSM cards installed on both
the east and west sides of the shelf.
7.
NTP-G47 Perform the Line Amplifier Node with OSCM and OSC-CSM Cards Acceptance Test,
page 4-30
—Complete this procedure to test line amplifier nodes with OSCM and OSC-CSM cards
installed.
8.
NTP-G48 Perform the OADM Node Acceptance Test on a Symmetric Node with OSCM Cards,
page 4-34
—Complete this procedure to test optical add/drop multiplexing (OADM) nodes with
OSCM cards installed on both the east and west sides of the shelf.
Summary of Contents for ONS 15454 DWDM
Page 38: ...Figures xxxviii Cisco ONS 15454 DWDM Installation and Operations Guide R6 0 August 2005 ...
Page 54: ...Procedures liv Cisco ONS 15454 DWDM Installation and Operations Guide R6 0 August 2005 ...
Page 64: ... 64 Cisco ONS 15454 DWDM Installation and Operations Guide R6 0 August 2005 Chapter ...